Refurbish 400 linear feet of track rails for “House Rig” to include removal of all the track. Scrape-prime – paint all tracks, Weld structural plates to entire length of tracks, Remove all existing railings. Refurbish and install in new pitch pockets, Remove existing skylight and replace in-kind, Demolish 30 sq. ft. of the existing roof. Replace with Siplast Torch grade 20/30 roofing membrane




