300 West 57th Street

Flag performed a multi-phase garage restoration project at the historic Hearst Tower. The concrete and masonry repairs included the removal of the existing coatings system, deck/floor patching, overhead patching, full concrete slab replacement, column and crack repairs. Once all of ...

601 West 26th Street

Shot-blasted the entire parking garage surface, approx. 40,000 SF. Sounded and removed deteriorated sections of concrete on the topside of the parking deck. Demolished and removed 100% of the concrete deck on top of the structural beams, installed new reinforcement ...

211 West 56th Street

Contract for 25,000 SF of garage consisting of 4 levels. Scope of work consisted of: Repaired 10,000 SF Concrete Deck Patching Repaired  9,000 SF Overhead Concrete Patching Performed,  3,500 LF of crack repair removed and replaced, 2,900 SF of full depth structural concrete ...